The require on the installation of energy saving ball mill
The require on the installation of energy saving ball mill
The installation of ball mill body
The installation of transaction parts
Regard the big gear wheel as the basic, then install and adjust the transaction parts, make sure the tooth width of small gear and big gear are accordant. In addition, the tooth surface of small gear and big gear also should keep accordant, the least space of gear should leave 0.25mm. The contact surface of big gear and small gear accounts for 60% of the overall length and about 40% of overall height.
Product List
The axis of ball mill body should show level, measure should on the top of both end of hollow shaft flange, and the height also should be accordant. If it has a error, lt is allowed that feeding end can higher about 1mm than discharging end. The hollow shaft and the surrounding gap of bearing cover should keep consistent, and the gap of outside and inside cover also should mainly be accordant.
When ball mill body was adjusted to be level, just then install the transaction parts. At first, check the quality condition of transaction parts, mainly check small gear shaft and reduction gear shaft is concentric or not.
http://www.mining-machines.com
magnetic separator : http://www.mining-machines.com/
Bucket Elevator : http://www.mining-machines.com/
rotary kiln : http://www.mining-machines.com/Lime.html
Vertical preheater : http://www.mining-machines.com
Previous Product : The rotary kiln operation skills
Next Product : Rotary Kiln for Calcining System